Home Eventi
24/11/2017
Wet scrubber with filling corps realized in AISI 304, for Germany
24/11/2017
Installato scrubber ad abbattimento ad umido per Azienda tedesca
24/11/2017
Realizzato per azienda specializzata nel riciclaggio di rifiuti RAEE
03/08/2017
We have built and installed a heating / cooling plant for a workplace of a button manufacturer
03/08/2017
We have built and installed a pilot plant for combustion of biomass for the production of ...
03/08/2017
We have manufactured and delivered a centrifugal fan model MP / GP 75 stainless steel for Rubber ...
03/08/2017
We have realized and delivered a venturi scrubber complete with centrifugal fan and control panel ...
03/08/2017
We have realized and installed a coalescence plant at a dyeing tissue flow rate 25.000 m3 / h